How the valve is mounted

Gate valves are irreplaceable elements present on almost every pipeline. During installation, a number of regulations must be observed.

Requirements for installation activities

In order for the valve to last as long as possible, while demonstrating proper efficiency, the following conditions must be observed during its installation:

Installation Recommendations

Good quality of installation of the new gate valve will ensure compliance with the following recommendations:

Upon completion of the installation activities, the entire system is crimped and flushed. If tests show a leak on the valve, it must be promptly eliminated. After that, the seal test is repeated for tightness.